water-pressure: great
shower-head: in need of an upgrade, but usable
leaks: none
drainage: not great, might be blocked
not only did i have a pleasantly hot shower now, even after shaving this morning and the geyser is only set for fifteen minutes (the minimum amount) per day (pre-shave), but the installation of the towel rail took all of two minutes. very cool 8).
i received no instructions with the blood tests, so i'm going out drinking tonight in preparation for tomorrow's Big Grill: i'm answering that call.
it bothers me that tech-support for my router is sunday - thursday, 9am - 5pm. let's assume that the usual issues with a router - like, say, your net connection going down at 2am - are not comfortably dealt with by this company. suck.
this is the puzzle from this morning
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.