no, the shower base wasn't installed today. in fact, nothing got done today. except for a serious quotation session, and i did use the hour or two... or three... to paint the skirting. so it wasn't a complete waste.
i arrived at the apartment at 8.30, ready to go, but it took the guys until 11.15 to finally arrive. they brought in all the gear (heavy gear), and began... and then stopped. there's a problem with the height of the shower base, the floor's got a slight gradient and they wouldn't be doing me any favours by doing a half a job.
so sunday i'll get a full quote for a complete job, and if i'm not happy i'll just have to go with 80x80 instead of 85x90 (turns out that 90cm in one of the directions is simply not possible - bummer).
the kitchen cupboard is a loss, and i'm actually glad that we caught it falling down because it shouldn't have been up there in the first place - i'm being taught the basics of all these professions now, and the only good solution is to add another counter across from the existing one. in short, my kitchen's going to look different, but i'll have a surface for my gas plate and things will be tidier.
the asbestos roof wasn't removed either; the builder's friend is more up-to-date than he is and we require municipal authorization.
we discussed all the storage possibilities - they both liked my pyramid bookshelf solution, and the bookshelf room separation.
i feel horrible about having been ripped off by the guy who came to lay the floors.
the breakfast corner is going to be awesome. mmf's wife's suggestion was inspired!
so after much talking and measuring, and laughter, i did some quick weekend shopping and am now going to spend some time with the gimp. then i'll probably take a nap. i like holidays, and i'm feeling a little bit better.